Studio Saga: August, 1999 (Final)

The New Studio Saga

August 3

One of the last things I needed before a final inspection was a concrete pad and sidewalks - necessary for handicap access. I decided to layout and form the concrete myself, and then hired Delbert Cagle to come over and do the pour.

pad_Nutt.jpg

Mr. Cagle came to the Nashville area to pour concrete and write songs.

planter_Nutt.jpg

There is always some concrete left over, and I was ready with forms for a planter, a bench and a cylinder. The planter forms were made from left-over T-111 siding, so the finish on the planter is a mirror image of the siding on the wood half of the studio.


August 8

The studio is finally finished (except for little details) and ready for the final inspection. If you can wait for these last images to load, I will give you a walk-through.

front_Nutt.jpg
entrance2_Nutt.jpg
gallery_Nutt.jpg

The Gallery in Front and Office/Conference Area Behind Partitions

bency_Nutt.jpg

Bench Room

machrm_Nutt.jpg

Machine Room

approved_Nutt.jpg

Approval!